List Of Completed Projects
Sl. No. | Details | Owner | Consultant | Start Date | Completion Date |
1 | G+1 Villa Plot # 352-0420 @ Jumeirah-3 | Mr. Abdulla Salim Ali and Brothers | Torpy Engineering | 07/07/2009 | 11/12/2010 |
2 | G+1 Villa Plot # 266-1817 @Oud Mutheena | Mr. Mualla Khalil Alsayed Khalil | Vision Engineering | 28/08/2009 | 12/07/2010 |
3 | G+1 Villa Plot # 354-1513 @ Al Quoz 1st | Mr. Khamis Darwish Khamis Mubarak | Hilal Consultants | 25/08/2008 | 31/07/2010 |
4 | GF villa+ KB-Plot# 354 -2157 @ Al quoz -1 | Mr. Ahmed Abdulla Salem Ali | Torpy Engineering | 01/03/2009 | 27/04/2010 |
5 | G+1 Villa Plot no: 376-1434 @ Al Barsha–2 | Mr.Mohd Hussain Hassan Mohammad | Chandrakanth Gajaria | 10/02/2008 | 25/08/2009 |
6 | G+1 Villa Plot no: 266-1939 @ Mutheena-2 | Mr. Hassan Mohd Khamis Al Balooshi | Lootah Consultant | 03/03/2008 | 23/07/2009 |
7 | G+1 Villa Plot no: 354-1654 @ Al Quoz – 1st | Mr. Jamal Ibrahim Ali Mohd Ibrahim | Lootah Consultant | 11/03/2008 | 28/03/2009 |
8 | G+1 Villa Plot # 423-1850 @ Al Warqa | Mr. Hassan Mohd. Al balouchi | Arab Experts | 21/05/2006 | 01/11/2008 |
9 | G+1 Villa Plot # 424-1193 @ Al Warqa | Mr. Hashim Darwish Ibrahim | Arab Experts | 15/02/2006 | 21/09/2008 |
10 | G+1 Villa Plot # 424-205 @ Al Warqa 4th | Mr. Juma Obaid Ali Alshamsi | Arab Experts | 10/01/2006 | 13/01/2007 |
11 | G+1 Villa Plot # 375-1850 @ Al Barsha | Mr.Galal Dad Rahman | Dimension Engineering | 01/10/2006 | 25/09/2007 |
12 | Ittihad School Plot # 363-307 @ Al Mamzar | Mr. Ibrahim Mubarak Bilal | Dimension Engineering | 19/09/2006 | 22/09/2007 |
13 | Proposed Shed Plot # 598-1166 @ D.I.P | Mr.Abdul Jalil Mohd. Al Asmawi | Ramesh & Associates | 07/04/2007 | 02/08/2007 |
14 | G+1 Villa Plot # 422-1132 @ Al Warqa | Mr.Sanad suhidi | Arab Experts | 05/03/2006 | 26/06/2007 |
15 | G+1 Villa on plot no: 359-175 @ Al Quoz | Mr.Matar Obaid | Spectrum Engineering | 15/06/2006 | 26/06/2007 |
16 | Construction of mockup villa | Union Properties | - | 05/10/2007 | 30/06/2008 |
17 | Car parking - JAFZA, Arabian Centre, LuLu, etc. | Technical Resources | - | 20/12/2006 | 30/10/2011 |
18 | Spinneys Market – 13 Nos. @JLT, Marina, etc. | Spinneys | - | 10/10/2006 | 29/09/2011 |
19 | G+1 Villa Plot # 281-3036@Khawaneej-1 | Mr. Rashed Abdulla Ibrahim Al Shaer | Lootah Eng. | 07/03/2010 | 11/3/2012 |
20 | G+1 Villa Plot #355-468 @ Al Quoz 2nd | Mr. Khalid Saleh Hassan Almarzooqi | Lootah Eng. | 06/10/2010 | 5/5/2012 |
21 | G+1 Villa Plot #261-481 @ Muhaisnah | Mr. Khalid Khalfan Mohd. Ali Aljallaf | Vision Eng. | 17/04/2010 | 12/10/2012 |
22 | G+1 Villa Plot # 375-1300 @ Al Barsha | Mr. Saeed Abdulla Saeed Al Towayer | Al Ghaith Eng. | 10/05/2010 | 5/10/2012 |
23 | G+1 Villa Plot # 281-3539@Khawaneej-1 | Mr. Tawfiq Moosa Hassan Md. Ashoor | Vision Eng. | 23/05/2010 | 2/21/2012 |
24 | G+1 Villa Plot # 422-0469@ Al Warqa 2nd | Mr. Jassem Abbas Yousuf Albalooshi | Vision Eng. | 08/12/2010 | 11/15/2012 |
25 | G – Villa Plot # 375-1353 @ Al Barsha | Mr. Abdulla Abbas Ahmed Saleh Alraisi | Vision Eng. | 04/01/2011 | 10/23/2012 |
26 | Majilis Block Plot # 423-2336@Warqa-3 | Mr. Md. Hassan Saleh Alali | Vision Eng. | 02/05/2011 | 12/14/2011 |
27 | G+1 Villa Plot # 281-236 @ Khawaneej-1 | Mr. Yousif Abdulla Rehman Abdel Ghani | Deira Eng. | 25/08/2011 | 8/25/2013 |
28 | G- Villa Plot # 375-1212 @ Al Barsha-3 | Mr. Salman Mussabih Almehairy | Al Majal Engineering | 01/04/2012 | 9/24/2013 |
29 | G+1 Villa + KB Plot # 672-3758 @ Al Barsha South 2 | Mr. Ali Ibrahim Ali Juma | Vision Eng. | 01/02/2012 | 7/9/2013 |
30 | G+1 Villa Plot # 672-0459 @ Al Barsha South 2 | Mr. Mansoor Abbas Saleh Hussain Al Raisi | Vision Eng. | 17/05/2012 | 5/18/2014 |
31 | G+1 Villa Plot # 355-801 @Al Qouz 1st | Mr. Nasser Ahmad Naqib Sanqoor | Vision Eng. | 22/06/2012 | 8/16/2014 |
32 | G+1 Villa Plot # 423-1310@Al Warqaa 3rd | Mr. Mohd. Ismail Mohd. Al Taher | Vision Eng. | 08/04/2013 | 12/21/2014 |
33 | Maintenance Villa | Mrs. Kaltham Bint Mohd. Mussabbeh Bil Qeizi | Vision Eng. | 15/09/2013 | 4/16/2013 |
34 | Maintenance Villa | Ms. FathmaYousaf Abdul Rahman Ali | Vision Eng. | 01/10/2013 | 10/05/2014 |
35 | G+1 Villa Plot # 671-3609, Al Barsha – South 1st | Mr. Khalid Hassan Abdulla Hassan Al Ali | Vision Eng. | 15/01/2014 | 12/05/2015 |
36 | G+1 Villa Plot # 266-1946, Oud Al Muteena 2nd | Mr. Essa Salem Abdulla Salem Al Ghafri | Al Anfal Eng. | 27/05/2014 | 28/01/2016 |
37 | G+1 Villa + KB Plot # 617-4246, Nad Al Sheeba-4 | Mr. Sultan Khalifa Sultan Bumaid Al Falasi | Vision Eng. | 23/04/2014 | 16/08/2015 |
38 | G+1 Villa Plot # 617-4248, Nad Al Sheeba - 4 | Mr. Ali Mahmood Ali Tamimi | Vision Eng. | 23/04/2014 | 16/08/2015 |
39 | G+1 Villa + KB Plot # 376-1949, Al Barsha 2nd | Mr. Naser Mohd. Naser Mohd. Hamad | Vision Eng. | 03/07/2014 | 09/12/2015 |
40 | G+1 Villa Plot # 281-5039, Al Khawaneej 1st | Mr. Ali Saif Abdulla Saif Alshamsi | Sahil Consultants | 18/02/2015 | 26/01/2017 |
41 | G+1 Villa + KB + Driver room Plot # 263-0993, Al Mizhar 2nd | Mrs. Moaza Beyat Mohammad | Vision Eng. | 16/11/2014 | 10/01/2017 |
42 | G+1 Villa Plot # 3550703- Al Quoz 2nd | Mr. Sharif Essa Mohd. Aldabbos Alsuwaidi | Designer East Arch. Eng. | 05/03/2016 | 01/02/2017 |
43 | Fit-out works | Spinneys JVC | M/s Spinneys LLC | ||
44 | Fit-out works | Spinneys Al Warqaa' | M/s Spinneys LLC | ||
45 |
G+1 Villa Plot#281-1952 @Al Khawaneej First | Mr. Khalaf Hassan Burman Majed Al Shamsi | Lootah Eng. Consultant | 02/09/2015 |
19/09/2017 |
46 | G+1 Villa+Kitchen Block Plot#281-4061@Al Khawaneej First | Mr. Khalid Abdulla Ahmad Balooq | Al Anfal Eng. Consultants | 02/04/2016 | 15/05/2018 |
47 | Completion of G+1 Villa Plot#355-0607@Al Qouz 2nd | Mr. Abdul Aziz Abdullah Saeed Saleem Alghafri | Lootah Consultant | 31/03/2016 | 30/12/2017 |
48 | G+1 Villa+Compound Wall Plot#7210-833@Al Awir 2nd | Mr.Moosa Mubarak Mohammed Saeed Alhelli | Designer East Eng.Design Consultancy | 06/09/2016 | 26/02/2018 |
49 | Construction of ground Floor+first floor Plot#617-4470@Nadd al Shiba 4th | Mr. Ali Khalifa Obaid Saqer Almarri | Vision Engineering Consultant | 16/04/2015 | 11/12/2017 |
50 | Construction of Shops Plot 931-0328@ Al lesaily | Mr. Azzan Obaid Saeed Ali Belhelli Alhajeri | Al Anfal Engineering Consultants | 11/06/2016 | 12/09/2019 |
51 | GtM shops Plot 931-0328@ Al Lesaily | Mr. Azzan Obaid Saeed Ali Belhelli Alhajeri | Al Anfal Engineering Consultants | 11/06/2016 |
12/09/2019 |
52 | Residential Villa G+1+KB Plot 282-5707@ Al Khawaneej 2nd | Mr. Rashed Mohammad Obaid Alweil Alsuwaidi | Al Anfal Engineering Consultants | 13/10/2016 | 10/12/2018 |
53 | Construction of G+1 Villa Plot 711-1723@ Al Aweer | Mr. Tael Abdulbaqi Mohamed Saleh Aljasmi | Designer East Eng.Design Consultancy | 30/01/2017 | 21/11/2018 |
54 | Construction of G+1 Villa Plot 282-6538@ Al Khawaneej 2nd | Mr.Mohammed Al Khamis Bakhit Alshamsi | SAS Consultants | 28/02/2017 | 21/11/2018 |
55 | Construction of G+1+Roof Villa+Service Block Plot 617-4277@ Nadd Al Shiba 4th | Mr. Fahad Mohammad Abdulrahman Ali Albeshri | Tasees Consultants | 16/05/2017 | 22/09/2019 |
56 | Construction of G+1 Villa Plot 424-7022@ Al Warqa Fourth | Mr. Saud Mohammed Ali Juma Alblooshi | Designer East Eng.Design Consultancy | 24/08/2017 | 05/09/2019 |
57 | Construction of G+1 Villa+compound Wall & Interlocking Plot 617-6144@ Nadd Al Shiba 4th | Mr. Rashed Ahmed Juma Alqandi Alfalasi | Sahil Engineering Consultants | 18/09/2017 | 26/03/2019 |
58 | Construction of G+1 Villa Plot 281-8829@ Al Khawaneej 1st | Mr. Majid Saif Mohd. Al Tawila Alsuwaidi | Ossol Engineering Consultancy | 07/10/2017 | 15/12/2019 |
59 | Construction of First Floor Plot 352-0420@ Jumeira | Mr. Yousuf Abdulla Salim Al Adeedi | Arkan Consultants | 23/01/2018 | 01/08/2018 |
60 | Construction of G+1Villa+KB Plot 282-6609@ Al khawaneej | Mr. Marwan Hilal Abdulrahman Ali Saeed | Al Anfal Engineering Consultants | 06/03/2018 | 31/10/2019 |
61 | Proposed Villa G+1+KB Plot 228-8356@ Al Tawar 3rd | Mr. Mohammed Ahmed Mohammed Burhaima | Arkan Consultants | 05/02/2018 | 25/04/2019 |
62 | Proposed Villa G+1+KB Plot 228-8357@ Al Tawar 3rd | Mr. Mohammed Ahmed Mohammed Burhaima | Arkan Consultants | 05/02/2018 | 23/04/2019 |
63 | Construction of G+1Villa+Majlis Plot 354-1398@Al Qouz 1st | H.H. Sheikh Saeed Bin Maktoum Juma Almaktoum | Al Srouji Archetectural Consultants LLC | 30/06/2018 | 26/08/2019 |
64 | Construction of G+1+R Villa | Mr. Mosaed Khalid Abdullatif Almuhaideb | Arkan Consultants | 05/11/2018 | 11/02/2020 |
65 | Construction Of Ground Villa Plot 282-2639@ Al Khawaneej 2nd | Mr. Adel ahmad Darwish Ahmad Albalooshi | New Arch Engineering Consultants | 13/12/2018 | 16/03/2020 |
66 | Construction of G+1 Villa Plot No: 281-5040 @ Al Khawaneej First | Mrs. Halima Mohammad Ishaq Basma Saif Abdulla | Sahil Engineering Consultants | 14/10/15 | 24/02/21 |
67 | Construction of G+1 Villa+Roof+Driver Room Plot No: 618-3906 @ Nadd Al Shiba First | Mr. Saeed Daghash Mater Ghadeyer Alketbi | Arkan Engineering Consultancy | 12/08/16 | 12/10/20 |
68 | Construction of G+1 Villa Plot No: 423-8298 @ Al Warqa Third | Mr. Abdulla Rashed Mohammad Abdulla Belhal | Osool Engineering Consultants | 09/08/18 | 01/10/20 |
69 | Construction of G+1+R Villa Plot No: 323-0192 @ Al Jafiliya | Mrs. Fouzia Abdulla Hassan Alghamish | Vision Engineering Consultants | 22/01/18 | 07/07/20 |
70 | Construction of G+1 Villa Plot 711-6619 @ Al Awir First | Mr. Abdulla Moosa Hassan Mohammed Ashoor | Vision Engineering Consultants | 30/06/18 | 14/12/20 |
71 | Construction of G+1 Villa Plot No: 711-6620 @ Al Awir First | Mr. Ibrahim Moosa Ashoor | Vision Engineering Consultants | 30/06/18 | 14/12/20 |
72 | Construction of G+1 Villa Plot No: 375-0849 @ Al Barsha Third | Mr. Abdulla Mohammed Ahmad Bin Amer Almahri | Arkan Engineering Consultancy | 18/07/18 | 09/09/20 |
73 | Construction of G+1 Villa Plot No: 376-1855 @ Al Barsha Second | Mr. Sadiq Abdullah Ahmed Al Balooshi | Skopas Engineering Consultants | 16/07/19 | 18/11/20 |
74 | Construction of G+1 Villa+Majlis+Driver Blocks Plot No: 376-2441 @ Al Barsha Second | Mr. Moaza Ahmad Belhoul Alfalasi | Alamir Engineering | 13/11/19 | 19/04/21 |
74 | Construction of G+1 Villa+Majlis+Driver Blocks Plot No: 376-2441 @ Al Barsha Second | Mr. Moaza Ahmad Belhoul Alfalasi | Alamir Engineering | 13/11/19 | 19/04/21 |
75 | Construction of G+1 Villa Plot No: 711-7664 @ Al Awir First | Mr. Mohammad Khalifa Saeed Rashed Bin Suroor | Signature Engineering Consultants | 27/03/2018 | 30/06/2021 |
76 | Construction of G+1 Villa + Majlis Block + Kitchen Block Plot No: 711-8315 @ Al Awir First | Mr. Saif Yousuf Mohammad Moosa Alblooshi | New Arch Engineering Consultants | 09/09/2019 | 07/09/2021 |
77 | Construction of G+1 Villa Plot No: 252-1024 @ Mushrif | Mr. Haitham Abdulhussain Jassim Abdulla Alzaabi | 7 Lines Engineering Consultants | 09/06/2020 | 15/02/2022 |
78 | Construction of G+1+R Villa Plot No: 671-3719 @ Albarsha South 2nd | Mr. Rashed Abdullatif Khalifa Belquhood Almheiri | Almaali Engineering Consultancy | 05/05/2020 | 26/10/2021 |
79 | Construction of G+1 Villa Plot No: 616-0113 @ Nadd Alshiba 3rd | Mr. Saif Mohammad Saif Alhuraiz Alfalasi | Archline Engineering Consultants | 20/12/2020 | 06/03/2022 |
80 | Construction of G+1 Villa Plot No: 913-0354 @Umm Nahad Third | Mr.Hamad Essa Mohammad Aldaboos Alsuwaidi | 7 Lines Engineering Consultants | 12/10/2020 | 21/04/2022 |
81 | WAITROSE FIT-OUT WORK AT AL-BARARI | M/S: FINE FARE FOOD MARKET L.L.C | MLC CONSTRUCTION COST CONSULTANTS | 12/05/2020 | 24/08/2020 |
82 | Construction of G+1 Villa Plot No: 711-7670 @ Al Awir First | Mr.Abdulaziz Mohammad Rashid Ahmad | Sahil Engineering Consultants | 14/04/2022 | |
83 | Construction of G+1 Villa Plot No: 431-8317 @ Wai al Shabak | Mr. Thani Ahmed Mohd Salem Albedwawi | AlMusheer Engineering Consultants | 22/07/2022 | |
84 | Construction of G+1 Villa Plot No: 672-3135 @ Al Barsha South Second | Mr.Hezaim Saif Harib Hamad Alsaadi | AlMusheer Engineering Consultants | 06/10/2022 | |
85 | Construction of G+1+Stair Room Villa Plot No: 711-5695 @ Al Awir First | Mr.Marvan Adel Anas Juma ALFalasi | SAS Consultants | 8/11/2022 | |
86 | Construction of G+1+Roof Villa Plot No: 671-0152 @ Al Barsha South First | Mr.Saeed Thani Mohd Bin Guba AlMehairi | Archline Engineering Consultants | 01/11/2022 | |
87 | Construction of G+1+R Villa Plot No: 618-0194 @ Nadd Al Shiba First | Mr.Abdul Rahman Ali Salem Ali Aladidi | Croquis Engineering Consultants | 30/11/2022 | |
88 | Modification and Extension of G+1 Villa Plot No: 376-1949 @ Al Barsha Second | Mr.Nasser Mohd Nasser Mohammed Hamad | AlMusheer Engineering Consultants | 15/12/2022 | |
89 | Construction of G+1 Villa + Service Block Plot No: 424-1275 @ Al Warqaa Fourth | Mrs. Aida Hamza Saleh Saeed | Vision Engineering Consultants | 23/10/2023 | |
90 | Construction of G+1+R Villa Plot No: 252-1255 @ Mushraif | Mr. Ali Hassan Ibrahim Ali Almarzooqi | Archpix Engineering Consultants | 17/05/2023 | |
91 | Construction of G+1+R Villa+Service Block Plot no: 431-4308 @ Wadi Alshabak | Mrs. Fatma Abdulbaqi Mohammad Saleh Aljasmi | AlMusheer Engineering Consultants | 27/07/2023 | |
92 | Completion of G+1+R Villa+Service Block Plot No: 262-4702 @ Al Mizhar First | Mrs. Amal Khalil Mansoor Alsayed Ahli | Nisreen Kayyali Consultants | 26/05/2023 | |
93 | Construction of G+1 Villa Plot No: 616-0114 @ Nadd Al Shiba Third | Mr. Heraiz Mohammad Saif Alhuraiz Alfalasi | Al Musheer Engineering Consultants | 17/05/2023 | |
94 | Construction of G+1 Villa Plot No: 913-1589 @ Umm Nahad Third | Mr. Yaser Juma Mohammed Saeed Buset Aldhaheri | Archpix Engineering Consultants | 07/12/2023 | |
95 | Construction of G+1 Villa Plot no: 424-0898 @ Al Warqaa Fourth | Mr. Talha Ali Moosa Fahim Al Balushi | Archline Engineering Consultants | 21/12/2023 | |
96 | Construction of G+1 Villa Plot no: 252-1191 @ Mushraif | Mr. Humaid Adeeb Abdulla Sultan Al Sharhan | Archline Engineering Consultants | 29/02/2024 | |
97 | Construction of G+1 Villa Plot no: 252-1185@ Mushraif | Mr. Abdulla Adeeb Abdulla Sultan Al Sharhan | Archline Engineering Consultants | 29/02/2024 | |
98 | Construction of G+1 Villa Plot No: 617-3312 @ Nadd al Shiba Fourth | Mr. Thani Khalifa Thani Altayer Almarri | Al Musheer Engineering Consultants | 14/03/2024 |